---
title: Easee
slug: help-center/easee
docTags: 
createdAt: 2026-07-24T08:02:50.521Z
---

# Guide: Integrating the Easee Charging Station with CLEMAP

:::hint{type="danger"}
**Important note before installation**

The **Site Key** and the **Circuit ID** are mandatory for integrating the Easee charging station with CLEMAP. Without this information, a correct connection is not possible.

You will find both in the Easee Portal at `https://control.easee.com/portal/sites`. Before commissioning, make sure you have access to the correct site object and that all data is complete.
:::

## Basic principle

Only the **master station** needs to be added as a "charging station". It represents the entire Easee circuit. The individual charging stations are automatically displayed in Floem as connectors of the master station.

![](https://api.archbee.com/api/optimize/N5BtsfQVOxPnQzfUQkalm/RCMJqR2BtTI0nmumEhCW__image.png)

## Finding the Site Key and Circuit ID

**Step 1:** Log in to the Easee Portal (`https://control.easee.com/portal/sites`) and open the desired **site**.

**Step 2:** In the overview, click the icon of the relevant **circuit**.

![](https://api.archbee.com/api/optimize/N5BtsfQVOxPnQzfUQkalm/0knqjrwn-92RnKuJba3Ry_grafik.png)

**Step 3:** The URL changes and now shows the corresponding **Circuit ID**, e.g. `#1062738`.

![](https://api.archbee.com/api/optimize/N5BtsfQVOxPnQzfUQkalm/adj1cWoIgi7YxZMGkoJoI_grafik.png)

**Step 4:** You will find the **Site Key** in the page title:

![](https://api.archbee.com/api/optimize/N5BtsfQVOxPnQzfUQkalm/MYyw00pEARbT00EfJ5Zsz_grafik.png)

:::hint{type="info"}
**Automatic name synchronization**

The name assigned to each charging station in the Easee Portal is automatically synchronized with the CLEMAP Floem Portal every 20 minutes – whenever changes are made or after a restart of the CLEMAP load management system.
:::

Happy charging!
