---
title: Alpitronic Hypercharger
slug: help-center/2cID-alpitronic-hypercharger
docTags: 
createdAt: 2023-11-23T10:31:29.637Z
---

:::hint{type="danger"}
Please ensure that the limit configured by **CLEMAP** for the charging station is always set lower than the station’s maximum grid value (**maxGridValue**).&#x20;
Else the limits written by CLEMAP will be ignored by the station, giving all sorts of problems.
:::

:::hint{type="info"}
### Update auf Alpitronic FW >= 3.1.0

1. Update CLEMAP to **FW 5.0.12 or later**.
2. Update the Alpitronic charger to **FW 3.1.0**.
3. In **FLOEM**, change the charger configuration version to **3.1.0**.

![](https://api.archbee.com/api/optimize/N5BtsfQVOxPnQzfUQkalm/KKYSqFoqh4WCwGGh3ZTXM_screenshot-2026-08-24-at-150646.png)

4. Verify that ModbusTcpInterfaceEnabled = true. In FW 3.1, it defaults to false, so the Modbus interface may be lost during the upgrade.
5. Test communication and charging control afterward.
:::

Typical Hypercharge configuration on local Hypercharge webinterface. *MobBus Enabled* shall be set to **True**. *Grid Fallback Timeout* shall be set to **5 seconds**.

![Hypercharge configuration](https://api.archbee.com/api/optimize/N5BtsfQVOxPnQzfUQkalm/yiNjoWdB2jijrz3mtyxGv_configuration-hyc.PNG "Hypercharge configuration")

Eventually call the alpitronic service desk so that they activate modbus on your charger from their backend: +3904711961333

Enter the Hypercharge IP Address and Port 502 on the CLEMAP Load Management configuration page.

![Example of Hypercharge configuration](https://api.archbee.com/api/optimize/N5BtsfQVOxPnQzfUQkalm/W8wbn1-CJkbXfWVYDC6Lt_configuration-hyc-on-clemap-load-management.PNG "Example of Hypercharge configuration")



Happy charging!
